东盟轨道交通的发展使得东盟得以构建起更为紧密的经济联系,这些项目为地区现代化进程注入了新动力。基于此背景,“2025第四届东盟轨道交通国际峰会”将在2025年1月9日至10日在马来西亚·吉隆坡召开,届时诚邀您共同讨论和见证东盟轨交的行业建设和发展。
The development of ASEAN rail transit has allowed ASEAN to build closer economic ties, and these projects have injected new impetus into the modernization process of the region. Based on this background, “The 4th ASEAN Rail Summit 2025” will be held in Kuala Lumpur, Malaysia from January 9 to 10, 2025, and welcome to attend to discuss and witness the construction and development of the ASEAN rail transit industry.
一、【Organizational Structure/大会组委会】
二、【General Conference Overview/大会议程】
1月9日
议题1:
全球化进程下东盟轨交市场发展
Morning Development of ASEAN Rail Market under Globalization
议题2:
数字技术驱动轨交项目建设
Afternoon Digital Technology Driving the Construction of Rail Transit Projects
1月10日
议题3:
跨境项目规划,标准化筑基,投融资拓机
Morning Cross-border Project Planning, Standardization as the Foundation, Investment & Financing Opportunities Expansion
议题4:
数字化赋能智慧运营与高效维保
Afternoon Digitization Empowers Intelligent Operations and Efficient Maintenance
三、【Part of Confirmed Speakers/确认发言嘉宾阵容】
四、【Hot Topics / 热点议题】
(1)互联互通——全球轨道交通市场状况及发展前景
Interconnection and Interoperability: Global Rail Transit Market Status and Development Prospects
(2)马来西亚轨交网络深度剖析:项目布局与未来增长
In-Depth Analysis of Malaysia’s Rail Transit Network: Project Layout and Future Growth
(3)经营地铁,服务城市——深圳地铁可持续发展 创新实践与探索
Operating Metro Services for the City: Innovative Practices and Explorations in the Sustainable Development of Shenzhen Metro
(4)革新铁路培训领域:学习技术的力量与转型
Transforming Rail Training with Learning Technologies
(5)东盟铁路网络互操作性和协调性分析
Introduction to ASEAN Railway Network Interoperability and Harmonization
(6)印尼铁路及城市轨道交通市场展望
Outlook on Indonesia’s Railway and Urban Rail Transit Market
(7)深化东盟标准化合作:全球视野下的互联互通策略
Deepening ASEAN Standardization Cooperation: Interconnection and Interoperability Strategies from a Global Perspective
(8)越南轨交标准化建设探索与实践
Exploration and Practice of Vietnam`s Rail Transit Standardization Construction
(9)借助技术进步深化并加强商业伙伴合作关系
Harnessing Technological Advancements to Strengthen Business Partnerships
(10)南宁地铁空调节能系统的创新应用与标准化产业化之路
Application, Standardization and Indushtrializatiation of Fine Design+Direct Expansion+Control by Subway air conditioning energy-saving system in Nanning Metro
(11)四川永贵:铁路连接技术的五十载历程
YGC—50 Years for Railway Connection Technology
(12)韩国铁路的未来展望:技术创新与可持续发展
Korean development Experiences & Case studies for Digitalization
(13)台湾智能铁路的发展
Smart Rail Development in Taiwan
(14)MARIC:赋能马来西亚铁路发展、激发创新、增强竞争力
The role of MARIC towards local empowerment, innovation and competitiveness
(15)优化工程与维护管理哲学,迈向卓越运营未来
Enhancing Maintenance Philosophy Towards Engineering & Operational Excellence
(16)雅万高铁的商业化之路
Commercialization of Whoosh
(17)实现菲律宾国家铁路的现代化可持续发展的重要性
Modernizing the Philippine National Railways for Sustainable Growth
(18)信号接口:实现东南亚地区无缝铁路运营的关键
Signalling Interfaces: The Key to Achieving Seamless Railway Operations in the Southeast Asian Region
(19)东盟轨交新蓝图:规划协同、标准统一与投融资创新
ASEAN Rail Transit’s New Blueprint: Planning Coordination, Standardization, and Investment & Financing Innovation
(20)未来出行新纪元:刷脸购票新体验
Pay with your face:Train Ticketing for the future
(21)德铁DB基于数据库的维护体系优化案例分享
Optimization of maintenance regime by DB
(22)通过智能化运营策略提升铁路系统的运载能力与可靠性
Enhancing capacity and reliability of the rail system through smarter operations
(23)智能多选决策工具:铁路战略规划的弹性引擎与快速融资之道
Smart and Multi-optional Decision-making Tools as a Must for More Resilient Rail Strategic Planning and as a way to Fast-track Financing
(24)高铁对地区发展的深远影响
Impact of High-Speed Rail on territories
(25)铁路数字化转型——东盟的下一步发展
Digital Transformation in Railways The Next Development in ASEAN
……持续更新中/Updating
五、【ASEAN RAIL AWARDS 2025 / 亚轨奖】
申报须知:
六、【Speak/Register/Media cooperation/Sponsorship cooperation 发言/参会/媒体合作/赞助合作】
https://www.shine-consultant.com/prod_view.aspx?TypeId=27&Id=425&FId=t3:27:3
Official Website of the Summit:
http://en.shine-consultant.com/prod_view.aspx?TypeId=11&Id=370&FId=t3:11:3
T:(+86 21)6095 7202
M:(+86)175 1049 7500(VX同号)
E-mail: ona.wen@shine-consultant.com
城市公交的承载能力和管理水平是一座城市运行韧性的直接体现。中国交通报4月17日报道,今年1至3月,重庆交通开投集团服务乘客公共交通出行超7亿人次,同比增加2.3%,日均客运量781.3万人次。 在如此高强度运营压力下,像大庙站这样的大型换乘公交站点无疑发挥着城市“毛细血管交汇处”的重要作用。市民对于公交车出行的诉求不仅是“时间准”,更希望“站点清楚”“出行方便”。为此,站台公司在设计与规划公交站时也在不断改进。 站台公司工作人员告诉记者:“根据我市路网的建设和变化,乘客人数的不断调整,我们会常态化地进行客流分析,再结合公交候车、停车的难易程度,市民热线及多渠道反映的出行需求,实时融入公交线路规划需求。”