华晨雷诺金杯汽车有限公司 电机设计工程师
栏目:人才招聘 发布时间:2019-07-11

3年以上经验本科以上学历


岗位职责:

1. Support all mechanical topics related to induction motor and synchronous motors for electric vehicles.

针对新能源汽车所涉及的三相异步电机和永磁同步电机,支持相关的机械设计。

2. Structure mechanic design of electric motors, calculation and selections of key elements like ball bearing, sealing, screws etc..

电机的机械结构设计,关键零部件的设计计算和选型,比如轴承,密封,螺钉等等。

3.Technical documentation and Support on motor manufacturing at production site related to mechanical aspects .

撰写相关的技术文档,对生产过程中遇到的问题提供技术支持

4. Support on test execution and check motor test reports.

了解相关电机测试知识,审阅测试报告。

5. Support on quality analysis of customer feedback.

对市场顾客反馈的不良分析进行技术支持.

6. Finish other work assigned by the leader.

完成领导交办的其他工作.

任职要求:

1. Major in comparable educational background. (Bachelor or above)

相关专业, 本科及以上学历。

2. Deep experience and capability in mechanical design and development for electric motor, preferred if in automotive area and with electrical machines.

有丰富的电机结构设计经验,如果有汽车行业或电动汽车行业从业背景更佳。

3. Skilled with mechanical design software such as NX (preferred), Pro/e, etc...

熟练使用超过一项2D/3D工具:NX 更佳。

4. Familiar with motor architecture, manufacturing process and techniques.

熟练电机的构架,生产工艺。

5. Good English listening, speaking, reading and writing.

良好的英语听说读写。

6. Good communication and presentation skills.

良好的沟通能力和讲演能力。

7. Good team player.

团队协作能力。

工作地点:

辽宁省沈阳市